Code Description Qty Unit Unit Cost Tax Cost Comment
0700 - Drywall Drywall Labour Quote 1.000 Lot $ 750.00 $ 0.00 $ 750.00 Quote from Bobs Drywall
0800 - Painting Painters Labour Quote 1.000 Lot $ 175.00 $ 0.00 $ 175.00
0400 - Framing Framers Labour Quote 1.000 Lot $ 800.00 $ 0.00 $ 800.00
0700 - Drywall Drywall Installer Labour Quote 1.000 Lot $ 85.00 $ 0.00 $ 85.00
1000 - Finsh Carpentry Finsh Carpenter Labour Quote asdf 1.000 Lot $ 125.00 $ 0.00 $ 125.00
1100 - Windows Window Package Supply Only 1.000 Lot $ 140.00 $ 0.00 $ 140.00
0300 - Steel Telepost 54in - 100in 1.000 EA $ 70.71 $ 3.54 $ 74.25
0300 - Steel Telepost 54in - 100in 1.000 EA $ 70.71 $ 3.54 $ 74.25
0300 - Steel 3/4" Bolt 6.000 EA $ 2.30 $ 0.69 $ 14.49
0400 - Framing Truss Package 1.000 EA $ 425.00 $ 21.25 $ 446.25
0200 - Concrete Concrete Material - Slab 1.403 m3 $ 300.00 $ 21.05 $ 441.99
0200 - Concrete Rebar - Slab 107.149 kg $ 2.50 $ 13.39 $ 281.27
0200 - Concrete Finishing Labour - Slab 12.555 m2 $ 1.00 $ 0.00 $ 12.55
0200 - Concrete Vapour Barrier Below Slab 135.141 ft2 $ 0.06 $ 0.41 $ 8.51
0200 - Concrete Concrete Material - Walls 4.339 m3 $ 300.00 $ 65.09 $ 1,366.84
0200 - Concrete Rebar - Walls 331.354 kg $ 2.50 $ 41.42 $ 869.81
0200 - Concrete Concrete Labour - Walls 19.413 m2 $ 5.00 $ 0.00 $ 97.06
0200 - Concrete Concrete Material - Footings 0.910 m3 $ 300.00 $ 13.65 $ 286.68
0200 - Concrete Rebar - Footings 69.497 kg $ 2.50 $ 8.69 $ 182.43
0200 - Concrete Labour - Footings 4.072 m2 $ 1.00 $ 0.00 $ 4.07
0400 - Framing 2x8 150.931 ft $ 0.80 $ 6.04 $ 126.78
0400 - Framing 2x8 Treated Sill 24.392 ft $ 1.10 $ 1.34 $ 28.17
0400 - Framing 3/4 Plywood Subfloor 5.336 Sheet $ 33.60 $ 8.96 $ 188.24
0400 - Framing Screws for Subfloor 232.829 EA $ 0.03 $ 0.36 $ 7.46
0300 - Steel Steel-Beam 121.176 kg $ 3.75 $ 22.72 $ 477.13
0200 - Concrete Base Gravel Material 2.726 m3 $ 17.00 $ 2.32 $ 48.66
0200 - Concrete Base Gravel Labor 17.989 m2 $ 1.00 $ 0.00 $ 17.99
0650 - Insulation Insulation Material for Walls 350.956 ft2 $ 0.83 $ 14.56 $ 305.86
0650 - Insulation Insulation and Vapour Barrier Labour 324.959 ft2 $ 0.30 $ 0.00 $ 97.49
0650 - Insulation Vapour Barrier Material 341.207 ft2 $ 0.13 $ 2.22 $ 46.57
0900 - Flooring Tile Material 53.611 ft2 $ 2.50 $ 6.70 $ 140.73
0900 - Flooring Tile Labour 48.737 ft2 $ 5.00 $ 0.00 $ 243.68
0900 - Flooring Tile Underlay Material 53.611 ft2 $ 2.10 $ 5.63 $ 118.21
0700 - Drywall 0.5 in x 8ft x 4ft Drywall Sheets 2.775 Sheet $ 7.97 $ 1.11 $ 23.22
0700 - Drywall Drywall Screws - Walls 121.077 EA $ 0.03 $ 0.18 $ 3.88
0800 - Painting Wall Paint Supply 0.484 Gal $ 0.00 $ 0.00 $ 0.00
0600 - Exterior Siding Material 48.630 ft2 $ 1.25 $ 3.04 $ 63.83
0600 - Exterior Siding Labour 45.448 ft2 $ 0.50 $ 0.00 $ 22.72
0400 - Framing 2x6 255.705 ft $ 0.63 $ 8.05 $ 169.15
0400 - Framing 2x10 25.616 ft $ 1.14 $ 1.46 $ 30.66
1000 - Finsh Carpentry Trim Material 23.982 ft $ 0.90 $ 1.08 $ 22.66
0400 - Framing 3/8 OSB Wall Sheathing 6.713 Sheet $ 10.61 $ 3.56 $ 74.79
0400 - Framing Nails for Wall Sheathing 292.940 EA $ 0.03 $ 0.45 $ 9.38
0600 - Exterior Gutters Material 6.637 ft $ 1.50 $ 0.50 $ 10.45
0600 - Exterior Gutters Labour 6.321 ft $ 0.50 $ 0.00 $ 3.16
0400 - Framing 2x4 188.953 ft $ 0.33 $ 3.12 $ 65.47
0400 - Framing 7/16 OSB Sheathing 2.870 Sheet $ 10.98 $ 1.58 $ 33.08
0400 - Framing Nails for Roof Sheathing 125.216 EA $ 0.03 $ 0.19 $ 4.01
0700 - Drywall 0.5 in x 8ft x 4ft Drywall Sheets 0.473 Sheet $ 7.97 $ 0.19 $ 3.96
0700 - Drywall Drywall Screws - Ceiling 20.649 EA $ 0.03 $ 0.03 $ 0.66
0500 - Roofing Shingles Material 54.759 ft2 (surface) $ 0.75 $ 2.05 $ 43.12 Timberline shingles from Home Depot
0500 - Roofing Roofing Nails 209.081 EA $ 0.02 $ 0.00 $ 4.18
0500 - Roofing Roofing Labour 49.781 ft2 (surface) $ 2.50 $ 0.00 $ 124.45
0600 - Exterior Building Wrap Material 94.858 ft2 (surface) $ 0.13 $ 0.62 $ 12.95
0600 - Exterior Building Wrap Fasteners 45.273 EA $ 0.10 $ 0.00 $ 4.53
0600 - Exterior Building Wrap Labour 86.235 ft2 (surface) $ 0.25 $ 0.00 $ 21.56
$ 290.75 $ 8,834.30
Sorting

Click the column headers to sort. Multi-column sorting can be performed by holding the SHIFT key and clicking more than one column header.

Search and Filter

Enter text in the search field to filter the report.

Column Re-ordering

Columns in Component Reports only may be re-ordered by clicking and dragging the column header. The order of the columns will persist until the selected fields are modified using the Report Setup Dialog. Columns for the other report types can not be re-ordered.

Copy Button

Copies the filtered table rows to the clipboard. The header will not be included.

Print Button

Exports the filtered table rows in a separate window and invokes the browser Print command.

Excel Button

Exports the entire table to a XLSX file that may opened in Excel. Filters and column sorting are ignored.